Do you want to know how to install FRP SMC Water Tank? Hengshui Jiubo Composites Co., Ltd. can tell you the steps.We are professional manufacturer of Fiberglass Reinforced Plastic Pipes.

1.Based on the first plane leveling cement, on the same plane so that the error should not exceed ± 0.5cm.
Welding channel: channel according to the size of the tank welding good match its size and the tank floor size, channel steel welding complete, the diagonal measurements, error of ± 0.5cm, and all welds to connect uniform row seam line.
2.Install the end state: water tank according to the board printed number and description of the arrangement, the connection of the tank bottom, while between two boards add sealing tape, bolted ¢ 10's. Securely sealed bottom plate, bolt afterburner afterburner to a uniform, one-time can not be too much force, otherwise due to uneven force caused by the split plate phenomenon.
3.Is connected with a fixed angle iron and channel steel base plate, so that the tank housing more firmly fixed on the basis of the channel.

FRP SMC Water Tank

4.Install states: water tank according to the board printed number and description to identify the layers tank state body, and previously separate state body assembled with bolts.
5.Install stretch: Stretch inner tank according to the size, number and find internal reinforcement length. Measuring stretch of wire reinforcement plate fastening parts, Indian painting, drilling, on to the wire, tighten to make a flat stretch in balance with the tank housing. If there is a large error between the casing and reinforcement, can be adjusted by adjusting the size of the error bolt tightness, until the error is adjusted to a minimum so far.
6.Install the cover: the final installation of the tank top cover, and even fastening bolts can not force too large or too small. After all the fasteners tank adjusted, according to the drawing hole location, a good all pipes, having a good valve flange for docking.
7.Tanks fully installed, unified inspection, adjustment, test the water does not leak in compliance.

CONTACT US
  • Plant address:No. 1056 South Yingbin Street, Jizhou district, Hengshui City, Hebei 053200 China 
  • Mobile: +86-13303314492
  • Whatsapp: +86-13303314492
  • E-mail: bella@aldfrp.com
MESSAGE
Copyright Hebei Aoliande Chemical Equipment Co.,LTD. All rights reserved.   
Online Service×